Data Center Transfer
We offer a complete solution for migrating your equipment from almost anywhere in Europe.
Our engineers are experts in the fast and hassle-free migration of equipment (servers, switches, routers).
We consult you according to the specific case and offer a complete end to end solution, without you needing to lift a finger.
Stages in the migration process
-
1Together with you, we draw up a plan for fast and hassle-free migration.
-
2We agree on the time and day when the equipment should be turned off and the migration should start.
-
3Our team of engineers goes to the location where your equipment is situated.
-
4We mark and photograph all cables, labels, and arrangement of the equipment.
-
5The machines are switched off, loaded into our van and transported to the S3 Data Center.
-
6We clean the equipment. If necessary, we can replace fans or thermal paste.
-
7We install the equipment and do a full inspection to make sure everything is working properly.
During the transportation of your machines to S3 Data Center, our technical team prepares everything necessary for them - PDUs, power cables, optical / copper patches.
That way we switch on your equipment immediately upon arrival, without delay.